Acton Depot TMU

Introduction

Make an Enquiry

Value: £8.5m
Timeline: 2017 – 2022
Client: Morgan Sindall
Contract Conditions: NEC Option A

Project Description: Emico were engaged to design, install and commission the electrical, mechanical, plumbing and fire systems of a new Train Modification Unit at London Underground’s Acton Works facility, which was constructed to provide access to the LU rail network for new and refurbished rolling stock as part of the Central line Improvement Programme (CLIP).

Open Gallery

Design & Delivery Detail:

  • Design, from concept, of MEP and Fire systems
  • Surveys, migration and strip out works
  • Permanent installation of MEP and Fire systems
  • Worked as integrated team with Morgan Sindall and their supply chain
  • Test and commissioning
  • System integration
  • Handover packs and client training

Client Key Issues: To deliver the project in time to meet key CLIP milestones
Client Benefits: CLIP milestones were met and strong relationship built with client