One of our key skills is the refurbishment of mechanical assets, particularly where operational continuity is vital. We have worked on many Network Rail and London Underground stations and depots where operational continuity was the key deliverable. At London Bridge Place, we designed and installed the new mechanical services whilst ensuring that London Bridge station remained operational. At Ilford and East Ham, Emico procured, installed, tested and commissioned the new boilers and systems for both depots. Emico removed and disposed of the redundant boilers at both depots, including both the amenity and shed boiler rooms at East Ham. With the new equipment installed and working, the crews at these vital depots were free to concentrate on keeping the railways running.
Emico has over 10 years of working with major clients in delivering the design and installation of mechanical equipment. From industrial boiler solutions to air conditioning and ventilation systems in offices and schools, we deliver complete solutions, right first time. We have worked with Network Rail on stations and depots in preparation for the London Olympics and with Crossrail in advance of the delivery of the new Elizabeth Line. We have installed mechanical equipment in the Shard in London.
To read more about how Emico has excelled in providing mechanical and engineering services for our clients, take a look at these case studies.