Crossrail - Bond Street

Introduction

Make an Enquiry

Electrical, Mechanical Public Health, Structural & Fire systems
Value:
 £1.4m
Timeline: 2020 – 2022
Client: ENGIE (EQUANS) / Crossrail
Contract Conditions: NEC Option E

Project Description: Emico were engaged to supply Engineering design services (MEPT&F) to deliver fully coordinated designs for areas of concern, covering services in both Eastern and Western ticket halls at Bond Street Station Crossrail. Emico’s Engineering team were brought in by Engie, working closely with Crossrail to rectify serious coordination issues left over from the previous JV. Completion of the station was already later than planned and Engie (EQUANS) were under considerable pressure to complete and open the station. Emico provided very-high standard engineering solutions and coordinated designs to allow Engie/Crossrail to achieve their goals of completing the installation of all services to the required high standards and handing the station over to TfL into revenue service. This was an incredible achievement which can be seen throughout the station, which Emico are very proud to have been part of.

Open Gallery

Design & Delivery Detail:

  • Fully coordinated engineering designs for ENGIE/Crossrail installation teams
  • On site engineering support for the construction and subcontractors
  • Engineering coordination for Fire and BMS systems
  • Design, installation and testing of Tunnel Ventilation Drainage system
  • Working as one team with both ENGIE and Crossrail
Open Gallery

Client Key Issues: To work collaboratively to rectify problems with MEPT&F systems
Client Benefits: Fully coordinated designs and solution by Emico and longevity of relations with client