Paddington Crossrail
Introduction
Make an EnquiryValue: £36m
Timeline: 2017 – 2020
Client: Costain Skanska Joint Venture (CSJV)
Contract Conditions: NEC Option A
Project Description: Emico are engaged to deliver the Electrical & Fire installations at the new Crossrail Paddington Station along with sections of the Mechanical systems as part of the historic and iconic Crossrail Project. Emico were pulled in by the JV to replace the encumbant failing M&E contractor. Against the backdrop of considerable time pressures and client change, Emico provided a high-quality installation which was flagshipped by TfL in their advertising promotion as a beacon of high standard. Emico are very proud of this achievement.
Open GalleryDesign & Delivery Detail:
Client Key Issues: To work collaboratively to rectify problems with current M&E systems
Client Benefits: Full delivery by Emico and longevity of relations with client