Paddington Crossrail

Introduction

Make an Enquiry

Value: £36m
Timeline: 2017 – 2020
Client: Costain Skanska Joint Venture (CSJV)
Contract Conditions: NEC Option A

Project Description: Emico are engaged to deliver the Electrical & Fire installations at the new Crossrail Paddington Station along with sections of the Mechanical systems as part of the historic and iconic Crossrail Project. Emico were pulled in by the JV to replace the encumbant failing M&E contractor. Against the backdrop of considerable time pressures and client change, Emico provided a high-quality installation which was flagshipped by TfL in their advertising promotion as a beacon of high standard. Emico are very proud of this achievement.

Open Gallery

Design & Delivery Detail:

  • Design support for the CSJV main team
  • Electrical strip-out of existing installed system
  • Permanent installation of electrical, fire and mechanical
  • Worked as integrated team with Skanska Rashleigh Weatherfoil
  • Test and commissioning
  • System integration
  • Handover packs and client training
  • Covering circa 30,000m² of floor space spread over 4 floors
Open Gallery

Client Key Issues: To work collaboratively to rectify problems with current M&E systems
Client Benefits: Full delivery by Emico and longevity of relations with client

Open Gallery