Victoria Dock Portal
Introduction
Make an EnquiryValue: £4.7m
Timeline: 2015 – 2019
Client: Taylor Woodrow / Vinci
Project Description: Providing a gateway into the tunneled section of the Elizabeth Line. Emico completed the MEPH fit out of the Head House, shaft, and emergency Intervention / escape platform.
Design & Delivery Detail:
Client Key Issues: A tight space, and limits on noise to protect local residents, meant the works presented logistical challenges. Critical Systems Integration.
Client Benefits: The Head House building was the first element of the Crossrail programme to be handed over in August 2019.